# Data Center Power, Real Estate & Digital Infrastructure Experts

From Ground to Gigawatt — From Land to Lease — From Connectivity to Cloud

[FIND SITES & POWER](/content/contact-us/index.html)  
[START A PROJECT](/content/contact-us/index.html)

## W Companies

#### Trusted by data center owners, operators, developers, hyperscalers, & enterprise end-users worldwide

_**"Great knowledge and very good negotiator. Always keeps best interest of the customer and fulfilling their requirements."**_  
\- Director of Cloud Infrastructure @ ChristianaCare Health

## What We Deliver

#### DATA CENTER POWER STRATEGY

**Power Strategy & Interconnection**

- Power Procurement
- Data Center Interconnection
- Powered Land
- Utility Interconnection
- Natural Gas, Solar, Utilities, Nuclear
- Power Infrastructure
- Substation Strategy
- Hybrid/Renewable Power

[REQUEST POWER STRATEGY](/content/contact-us/index.html)

#### DATA CENTER REAL ESTATE

**Data Center Site Selection & Powered Land**

- Data Center Land Acquisition
- From Land to Lease
- Tenant & Landlord Representation
- Full-Cycle Execution
- Strategic Location Analysis
- MW to GW-scale Power Availability
- Utility Partnerships
- Shovel-Ready Site Preparation

[CONTACT US](/content/contact-us#9707d2d7-913b-42cb-9753-67fbf1b9eccc/index.html)

#### DATA CENTER DEVELOPMENT

**Powered Land Development & Delivery**

- BTS & Turnkey Development
- Hyperscale Development
- Shovel-Ready Data Center Sites
- Strategic BD & Partnerships
- Entitlements, Zoning, Permitting
- Land Acquisition & Real Estate
- Infrastructure Delivery (Power + Fiber)
- From Ground to Gigawatt

[Schedule a Meeting](/content/contact-us/index.html)

#### DATA CENTER INTERCONNECTION

**Connectivity & Fiber Strategy**

- Cloud, Colocation, AI/ML Readiness
- Fiber & Network Infrastructure
- From Connectivity to Cloud
- Network Procurement & Deployment
- Channel & Ecosystem Partners
- Workload & Latency Strategy

[REQUEST PROPOSALS](/content/request-proposals#b5f2f36a-5532-4252-9ee0-ed1edc8e98b8/index.html)

#### DIGITAL INFRASTRUCTURE

**Digital Infrastructure & Partnerships**

- Cloud Infrastructure
- Cloud, Colo, Voice & Data Services
- Digital Infrastructure Consulting
- Digital Infrastructure Delivery
- Cloud GPU,  GPUaaS, AI/ML
- Compare, Secure & Deploy IT Services

## DATA CENTER LOCATOR

**Find Turnkey Data Centers**

Search by Power Availability, Location, Cloud Services, Network, Price/kW, Price/MW

[REQUEST ACCESS](/content/contact-us/index.html)

#### DATA CENTER NEWS

### Data Centers | Large-Load Interconnection: Who Really Wants What

December 3, 2025 | Data Center, Data Center Connectivity, Data Center Developers, Data Center Interconnection, Data Center Owners, Data Center Power, Data Center Power Strategy, Data Center Powered Land, Data Center Site Selection, Data Centers, Data Centre, Data Centres, datacenterpowers.com, Gigawatt (GW), Megawatt (MW), Power Procurement, Powered Land, U.S. Government

#### **Large-Load Interconnection: What Hyperscalers, Developers, Utilities, and Regulators Really Want**

On November 21, 2025, a wide range of organizations filed comments with the Federal Energy Regulatory Commission (FERC) regarding the Department of Energy’s (DOE) Advance Notice of Proposed Rulemaking (ANOPR) on **large-load electric interconnections** (Docket No. RM26-4-000). Filers included:

**- American Public Power Association (APPA)**
**- Pennsylvania Public Utility Commission (PUC)**
**- Arizona Corporation Commission (ACC)**
**- National Association of Regulatory Utility Commissioners (NARUC)**
**- Electric Power Supply Association (EPSA)**

These filings responded to FERC’s inquiry on accelerating the interconnection of **very large loads** — including data centers, AI campuses, industrial loads, and hybrid/BTM facilities. And while each group approached the issue differently, the filings collectively highlight a **major tension** now shaping the future of U.S. data center development: **Who gets power, how fast, and who pays for the upgrades?**

#### **Key Themes From the November 21 Filings**

**1. State jurisdiction & federal overreach concerns.** State commissions — especially the Pennsylvania PUC and Arizona Corporation Commission — warned that the ANOPR could **invade state authority** over:

- **Retail Tariffs**
- **Resource Adequacy**
- **Cost Recovery**
- **Local Reliability**

**2. Cost allocation & stranded cost protection.** APPA and multiple state bodies stressed that **existing customers cannot be forced to subsidize upgrades** triggered by 100–500 MW data center loads.

**3. Support for acceleration (with guardrails).** EPSA supported the **idea** of accelerating large-load interconnections but emphasized:

- National consistency in process
- Avoiding rigid, prescriptive mandates
- Respecting state authority on retail matters

#### **Final Takeaway**

The next era of U.S. data center expansion will be shaped not only by hyperscalers and utilities, but by developers, operators, investors, PSCs, and consumer advocates.  
**If DOE and FERC want faster large-load interconnections, all six stakeholder groups must be included — especially developers, who now drive a significant portion of new queue volume, powered-land acquisition, and multi-phase campus planning.**

The rules written now will determine whether the next 20+ GW of digital infrastructure is delivered efficiently — or delayed by misaligned incentives across the ecosystem.